12 Foot Craps Part 8

Posted April 27, 2015

I installed the T-nuts on the padded rail. I’m thinking about epoxying them as well. I don’t want them to push out after I finish the foam and vinyl.

Then I stained the table perimeter and box.  I went with a lighter stain this time.

 

 

 

I got the new 1/2″ collet for the router and tried it on a test piece of 2×6 cut down to 4″. There is something wrong with my core box bit as it causes really bad vibration on the router. I think it is unbalanced somehow. I ordered a new one. I’ll have to wait on that now.

I think some poly on the perimeter, and the box will be next.

Posted on April 27th, 2015 by Clayton

Posted in Around the House, Craps, Woodworking

Comment on this post

Leave a Reply